South 13th Place Water Main Replacement, South Lake Drive Force Main Replacement and Storm water Improvements

This project will replace a 6" water main on South 13th Place that has reached it's useful life. This project will replace a 6" force main that has reached it's useful life from East Central Blvd. on South Lake Drive to Lake Worth Ave. This project will install a new storm water system on South Lake Drive, Milton Street, Prospect Road, South Lake Drive to Euclid Blvd./ Euclid Path.    

Update:

** South 13th Place;

All of the new 6" piping and 2 fire hydrants for the water main has been installed and all bacterial testing is completed. We are waiting for the Palm Beach County Health Department approval to complete the tie ins to put the new main into service.

** South Lake Drive Force Main Replacement;

All of the new 6" piping for the force main has been installed. We are waiting for the Palm Beach County approval to put the new main into service.

**Storm water Improvements;

The new concrete piping and structures are being installed from Euclid Blvd. south on South Lake Drive to Prospect Road starting the week of September 15, 2018.

The contractor will be installing the storm water system piping and structures for the next two weeks in the area listed above.

Please see attached below for a copy of the project overview and a copy of the construction plans.

S. Lake Drive Photo.docx

The Plans for S. Lake Dr. Force Main Replacement and Storm Water Improvements 2018.pdf

South Atlantic Drive Water Main Replacement

This project will add a new water main from East Ocean Avenue to the dead end of Southeast Atlantic Drive. This will increase the amount of water flowing south from East Ocean Avenue to Southeast Atlantic Drive. This will also increase the amount of water for drinking, irrigation, and fire protection.

Update:

Please be advised:

The Road Construction and paving is scheduled to begin on September 17, through September 22, 2018. Traffic will be down to one lane.

See details below.

All 6" and 8" piping and 9 fire hydrants were installed.

In the next 3 to 4 weeks the main will be flushed, disinfected, tested for Palm Beach County Health Department approval. The final tie in can be made to bring the new main into service.

We ask that you park your vehicles on a street not affected by the new water main installation. In other words, out of the area of road milling and asphalting. Within an hour of completing your section of the Lane or Road, it is drivable. However, after milling and before asphalting, there is an application of hot, Liquid Tar which is applied. ABSOLUTELY NO DRIVING ON THE LIQUID HOT TAR. Only after the asphalt is immediately applied and a one half hour curing period, can you drive on the new road surface.

Please see attached below for a copy of Intercounty Engineering, Inc. notification. 

Letter Notification to Residents - Final Phase.pdf

If you have any questions please contact Jerry L. Darr at (561)540-5758 or at jdarr@lantana.org