13th Place Water Main Replacement, South Lake Drive Force Main Replacement and Storm water Improvements

This project will replace a 6" water main on South 13th Place that has reached it's useful life. This project will replace a 6" force main that has reached it's useful life from East Central Blvd. on South Lake Drive to Lake Worth Ave. This project will install a new storm water system on South Lake Drive, Milton Street, Prospect Road, South Lake Drive to Euclid Blvd./ Euclid Path.    

Update: Project is complete on 5/30/2019

Please see attached below for a copy of the project overview, Water Main Replacement Permit and a copy of the construction plans.

S. Lake Drive Photo.docx

Updated Plans Lake Drive FM_Permit_11x17.pdf

138282-040 DSGP South Lake Drive WM Replacement.pdf

South Atlantic Drive Water Main Replacement

This project will add a new water main from East Ocean Avenue to the dead end of Southeast Atlantic Drive. This will increase the amount of water flowing south from East Ocean Avenue to Southeast Atlantic Drive. This will also increase the amount of water for drinking, irrigation, and fire protection.

Update:

Please be advised:

All 6" and 8" piping and 9 fire hydrants were installed.

In the next 3 to 4 weeks the main will be flushed, disinfected, tested for Palm Beach County Health Department approval. The final tie in can be made to bring the new main into service and then the old fire hydrants will be removed.

UPDATE; Project is complete. 

 Water Plant Upgrades and High Service Pumps Replacement

The Town owns and operates the Town of Lantana Water Treatment Plant (WTP). The plant includes a high service pumping system which distributes potable water to its customers. Mathews Consulting  previously prepared a technical memorandum outlining the recommended upgrades to the Town's high service pumping system. The technical memorandum proposed the renewal and replacement of the Town's high service pumping system due to age of the equipment and facilities. The Town reviewed and approved the technical memorandum and subsequently requested Mathews Consulting   to provide a CSA for the engineering services related to the proposed improvements .

Update: January 15, 2019 

Approved by Council on January 14, 2019 for the design, bidding and project oversight.  

Update: August 06, 2019

60% design plan are under review.

If you have any questions please contact Jerry L. Darr at (561)540-5758 or at jdarr@lantana.org