A/C Changeout Checklist

Instructions: 

  • All permit applications, two paper copies, and one digital copy of permit documentation should be submitted to the Development Services Department.
  • Please note at this time we only accept cash or check payments (due at submittal).
  • Please email buildingpermit@lantana.org with any questions regarding your submittal. 

Please check to confirm submittal of the following: 

  • Completed Permit Application, including description of work (note if an exact changeout)
  • Contractor Registration Details (State License/Competency, County BTR, Liability Insurance, Worker’s Compensation, Qualifier Details) or Owner Builder Affidavit
  • 2 copies of the AHRI Certificate 
  • 2 copies of the Town of Lantana Air Conditioning Changeout Form
  • 2 copies of the Tie Down Details

Also submit, if applicable: 

  • If the proposed A/C is not an EXACT changeout, submit 2 copies of a survey including:
    • Location of the proposed unit
    • Setbacks to the property line from the unit (See Ch. 23, Article V for specific zoning district)
    • Elevation of the proposed unit
  • If the permit is being pulled by an Owner Builder, submit:
    • 2 copies of the Section 608 EPA Technician Certification
  • If the project is in the Special Flood Hazard Area, submit:
    • 2 copies of a signed and sealed Elevation Certificate
  • If the project includes new duct work, submit:
    • 2 copies of drawings of the proposed duct work
  • If work is being done beyond the disconnect box, submit:
    • Town of Lantana Subcontractor Application for electrical and registration details
    • $30 subcontractor fee

Notes:

  1. A/Cs are required to meet all Lantana Code requirements, including those of Ch. 6 Building and Building Regulations and Ch. 23 Zoning. For additional information on Code Requirements, visit https://library.municode.com/fl/lantana/codes/code_of_ordinances.
  2. Mechanical equipment may not encroach in a required setback, unless the proposed unit is for the exact replacement of an existing unit.
  3. A certified NOC is required on A/C permits with a value of greater than $7500 prior to scheduling an inspection. 
  4. Please note this checklist is not intended to be all-inclusive. Additional documents may be requested.